Previous page

Next page

Shift Groups - Costing

This tab page associates costings with a Shift Group. These details can be overridden by the Costing tab page in a shift.

The fields on this tab page are as follows:

Field

Description

Cost Centre

Select a cost centre from the pick list.

Job

Select a job code from the pick list.

Award

Select an award from the pick list.

Rate

Select a rate code from the pick list.

Rate Amount

Enter a rate amount.

Factor

Enter a factor. Usually 1.

Topic: 13267