Previous page

Next page

Auto-placement

PayGlobal can perform the following processes for each pay sequence that you open, if you configure the required settings:

 

Requirement Check

The Requirement for each date is checked to see whether it will generate an Allocation record. For each Requirement code and date, PayGlobal completes the following:

  1. Checks that the Requirement is active for this date.

    If a start date is defined for the Requirement, the date being considered is only accepted if it is:

    For example, if the Requirement start date is a Monday, and the Requirement frequency is 7, then an Allocation is only generated if the date being considered is also a Monday.

  2. Checks that each Requirement Tour is active and uses the start date to determine the current day of the cycle. For example, if the Requirement start date is a Monday, the Requirement Tour duration is 7, and the date being considered is a Wednesday, then the current day of the cycle is day 3.
  3. If this Requirement is defined on the Requirement Tour | Requirements tab for day number 3, PayGlobal creates an Allocation record for this date and Requirement.

    Note: If an override list of timebands, qualifications, and/or competencies are defined for this requirement, they need to be copied into the Allocation Override table.

 

Default Roster

The default Roster for every matching employee is generated for each date in the current pay sequence. For each employee code and date, PayGlobal completes the following:

  1. Loads the employee’s default Roster for this date and the previous date.
  2. Saves the Roster. PayGlobal does the following for each timeband in the day for the employee:

Previous page

Next page

Topic: 13507